Welcome to today's ASTE_Paper Knowledge Booster! We've handpicked 10 essential questions from our database to help you sharpen your skills. Dive in and test your knowledge!
Q1. At the departure end of a double line station with a slip siding, the slip siding shall be set to the block section only when_____________. स्लिप साइडिंग वाले डबल लाइन स्टेशन के प्रस्थान छोर पर, स्लिप साइडिंग को ब्लॉक सेक्शन में केवल तभी सेट किया जाएगा जब _____________ हो।
- A) block instrument is set to train on line
- B) block instrument is set to line clear
- C) set independent of block instrument
- D) none of the options
Correct Answer: block instrument is set to line clear
Q2. In VoIP telephony, signalling is based on __________________. VoIP टेलीफोनी में, सिग्नलिंग __________________ पर आधारित होती है।
- A) SIP
- B) MGCP
- C) Both SIP and MGCP
- D) none of the options
Correct Answer: Both SIP and MGCP
Q3. High availability of circuits such as PRS/UTS etc. is achieved by ____________. पीआरएस/यूटीएस आदि जैसे परिपथों की उच्च उपलब्धता ____________ द्वारा प्राप्त की जाती है।
- A) path diversity
- B) equipment redundancy
- C) multiple service providers connectivity
- D) All the options
Correct Answer: All the options
Q4. A Railway Servant shall be permitted to encash leave on average pay in his career for a maximum of ____________. CBT ASTE 2025 रेल कर्मचारी को अपने पूरे करियर में औसत वेतन पर अधिकतम ____________ तक अवकाश भुनाने की अनुमति होगी। CBT ASTE 2025
- A) 60
- B) 10
- C) 30
- D) 300
Correct Answer: 60
Q5. The current rating of a battery charger is 35 amps and the load current at the station is 15 amps, the maximum AH capacity of the battery bank to be used is________. बैटरी चार्जर की वर्तमान रेटिंग 35 एम्पियर है और स्टेशन पर लोड करंट 15 एम्पियर है, उपयोग किए जाने वाले बैटरी बैंक की अधिकतम AH क्षमता ________ है।
- A) 200 AH
- B) 120 AH
- C) 80 AH
- D) 300 AH 300 एएच
Correct Answer: 200 AH
Q6. In MACLS territory, if a signal is blank, i.e, not showing any aspect then__________. CBT ASTE 70% 2025 MACLS क्षेत्र में, यदि कोई सिग्नल खाली है, यानी कोई पहलू नहीं दिखा रहा है, तो __________। CBT ASTE 70% 2025
- A) Signal in rear of the defective signal shall display its most restrictive aspect
- B) Signal in rear of the defective signal shall display red
- C) Signal in rear of the defective signal shall be unaffected
- D) none of the options
Correct Answer: Signal in rear of the defective signal shall display its most restrictive aspect
Q7. The range of Wireless communication depends on ____. वायरलेस संचार की सीमा ____ पर निर्भर करती है।
- A) Power output of the Radio equipment
- B) Height of the antenna
- C) Gain of the antenna
- D) All the options
Correct Answer: All the options
Q8. Which one of the followings is the longest distance travelling train in India? निम्नलिखित में से कौन सी ट्रेन भारत में सबसे लंबी दूरी तय करने वाली ट्रेन है?
- A) Vivek Express
- B) Himsagar Express
- C) Silchar Super-fast Express
- D) Navyug Express
Correct Answer: Vivek Express
Q9. For running trains at 130 kmph, the minimum standard of interlocking to be provided in stations in the section is इस खंड में स्थित स्टेशनों पर ट्रेनों को 130 किमी प्रति घंटे की रफ्तार से चलाने के लिए न्यूनतम इंटरलॉकिंग मानक निम्नलिखित होना चाहिए:
- A) Standard |
- B) Standard II
- C) StandardIII
- D) Standard IV
Correct Answer: StandardIII
Q10. In the process of RDSO approval for new products of workshops, CCA stands for _______. कार्यशालाओं के नए उत्पादों के लिए आरडीएसओ अनुमोदन की प्रक्रिया में, सीसीए का अर्थ _______ है।
- A) Cumulative capacity analysis
- B) Capacity cum capability analysis
- C) Capacity cum capability assessment
- D) Calculation of capacity assessment
Correct Answer: Capacity cum capability assessment