Station Master Syllabus
Station Master — LDCE / General Selection — Consolidated syllabus for the 15% LDCE and 25% general selection quotas.
Exam pattern
| Section | Questions | Attempt |
|---|---|---|
| Railway Working | — | — |
| Commercial and Establishment Rules | — | — |
| General Subjects | — | — |
Marks, timing and qualifying marks are set by your zonal railway's notification — check it before the exam.
Your progress
Track this syllabus. Sign in to tick topics as done or mark them for revision — your progress is saved.
Sign inRailway Working
G&SR — Signals and Systems of Working Operating Rules (Group C) 7
No mock test covers this yet.
- Definitions (G&SR)
- Types of signals and their use; signal aspects
- Gate, fog (detonator), calling-on and shunt signals; IBS
- Defective signals; working when all signals fail
- Systems of working: absolute block, automatic block, one train only
- Authorities to proceed (all types)
- Working during total failure of communication
Station Working Operating Rules (Group C) 6
No mock test covers this yet.
- Classification of stations; Station Working Rules
- Reception, despatch, crossing and overtaking
- Points and interlocking: panel, RRI, EI
- Block instruments; line clear; paper line clear ticket
- Block instrument failure; abnormal working
- Caution orders and speed restrictions
Shunting and Marshalling Operating Rules (Group C) 5
- Shunting: control and responsibility; shunting on arrival of trains
- Loose shunting; securing vehicles; skids and scotch blocks
- Block back and block forward
- Marshalling of coaching, goods, POL and dangerous-goods trains
- Brake van; sick and POH-due wagons
Level Crossing Gates Operating Rules (Group C) 2
- Working of interlocked and manned gates
- Train working when a gate is defective
Engineering Blocks and Electrified Sections Operating Rules (Group C) 2
- Engineering line blocks and material trains
- Working on electrified sections; OHE failure; power blocks
Train Working and Special Movements Operating Rules (Group C) 4
- Train speeds; additional speed limits over facing points
- Air brake and vacuum brake
- ODC; crane movement; BFNV
- Tower wagons, track machines, light engines and bank engines
Accidents and Safety (Group C) Operating Rules (Group C) 6
- Classification and reporting of accidents
- Duties of SM and staff in accidents; protection of line
- ART / ARME; joint notes; enquiries
- SPAD and accident prevention
- Hot axle, brake binding, train parting, hanging parts
- Fog and monsoon precautions; disaster management; fire safety
Railway Technology (Operating) Operating Rules (Group C) 3
- COA, FOIS, ICMS, NTES, CMS, TMS
- RRI, EI, CTC, BPAC, MSDAC, data loggers
- WILD, FIBA, FDS and other safety aids
Commercial and Establishment Rules
Commercial Basics (Group C) Operating Rules (Group C) 4
- Goods and parcel booking; commercial documents
- Wagon indent and registration
- Demurrage and wharfage (and their waiver)
- Siding rules; goods shed working
Establishment Rules (Group C) General (Group C) 6
- Railway Services (Conduct) Rules 1966
- D&A Rules 1968: penalties, charge sheets and standard forms
- Leave rules (LAP, LHAP, CCL, maternity)
- Pass rules and PTOs; duty passes
- HOER
- Seniority and promotion; APAR basics
General Subjects
General Ability General (Group C) 6
- General English: sentence correction, grammar, vocabulary
- Arithmetic (10th standard)
- Reasoning and aptitude
- General knowledge and current affairs
- Indian Railways: organisation, zones, PSUs (CRIS, RDSO, IRCTC, DFCCIL) and achievements
- Computer basics: MS Office, internet, railway applications, cyber security
Official Language Official Language 4
No mock test covers this yet.
- Official Language Policy (Constitution, Articles 343–351)
- Official Languages Act, 1963
- Official Languages Rules, 1976
- Incentive schemes for Hindi
Source: Compiled from departmental syllabi published for this post (no single all-India order). The notification for your exam is the final word on its syllabus.