Knowledge Booster: NAIR Edition (25 May 2026)
Welcome to today's NAIR Knowledge Booster! We've handpicked 10 essential questions from our database to help you sharpen your skills. Dive in and test your knowledge!
Q1. When does the 'A' marker get illuminated in a Semi-Automatic Stop signal?
- A) When the signal works as a Manual Stop signal
- B) When the signal works as an Automatic Stop signal
- C) When the signal works as a Semi-Automatic Stop signal
- D) When the signal works as an Advance Stop signal
Correct Answer: When the signal works as an Automatic Stop signal
Q2. When the control is interrupted and no communication with the controller is possible who will be responsible for working and regulating of train?
- A) Station Master
- B) Chief Controller
- C) AOM/DOM (Control)
- D) Sr.DOM
Correct Answer: Station Master
Q3. When the train is required to stop and the restriction is likely to last only for a day or less three detonators shall be placed at a distance of in BG."
- A) 1200m
- B) 800m
- C) 600m
- D) 400m
Correct Answer: 1200m
Q4. Formula of Loco outage is?
- A) Total engine hours from shed/24
- B) Engine hours for traffic use/12
- C) Total engine hours from shed/12
- D) Engine hours for traffic use/24
Correct Answer: Engine hours for traffic use/24
Q5. How many dead engines can be attached to Mail/Express/Superfast trains?
- A) 1
- B) cannot be attached
- C) 2
- D) None of these
Correct Answer: 1
Q6. Free time for un-loading of BTPN type of wagon under Engine on load scheme is given as?
- A) 5 hours
- B) 6 hours
- C) 9 hours
- D) None of these
Correct Answer: 5 hours
Q7. Premium Examination' pattern pertains to?
- A) Freight Traffic
- B) Passenger Traffic
- C) Parcel Traffic
- D) All the given options
Correct Answer: Freight Traffic
Q8. Under which section of the Railways Act, 1989, accidents are reportable to CRS?
- A) Section 111
- B) Section 112
- C) Section 113
- D) Section 114
Correct Answer: Section 113
Q9. In case of double exit siding target time for turning out the Medical Van is-
- A) 25 Minutes
- B) 15 Minutes
- C) 35 Minutes
- D) 30 Minutes
Correct Answer: Deleted
Q10. What does RTIS stands for?
- A) Right Time Train Information System
- B) Real Time Train Information System
- C) Real Time Terminal Information System
- D) None of the given options
Correct Answer: Real Time Train Information System
Best portal for railway departmental exam
mycbt.in - join free
Comments 0
Post CommentNo comments yet. Be the first to comment!